Delivery GuaranteeMonthly output exceeds 1500 tons
Green Factory ProductionThe building area is 40,000 square meters
Full-scale QC and R&D TeamHas a number of invention patents
| Fain Fused Cast Zirconia Corundum Products (AZS) Finished Products (Machined) Inspection Internal Control Standard | |||||
| Unit;mm | |||||
| Item | Processing indicators | ||||
| First Grade | Second Grade | Defective | Reject | ||
| Processi ng requirem ents | Machining Area | The processing area of a single product reaches 100% of the processing requirements. | The processing area of a single product reaches 97% of the processing requirements. | The processing area of a single product reaches 95% of the processing requirements. | / |
| Size and flat ness | Dimensional Deviatio | n ±0 | ,+0~-1 | ,+0~-2 | / |
| Diagonal | ≤1 | ≤1 | ≤2 | / | |
| Flatness | ≤0.5 | ≤1 | ≤1 | / | |
| Non-Building Surface | Convex 1,concave 1 | Convex 1,concave 1 | Convex2,concave2 | / | |
| Ordinary Brick / Nozz | le Protrusion: Not allowed | Protrusion: 2~3 | Protrusion: 4~5 | / | |
| Tilted Brick / Nozzle | Protrusion: Not allowed | Protrusion: 2~3 | Protrusion: 4~5 | / | |
| Shrink-hole Free Brick | Not allowed | Not allowed | Not allowed | / | |
| Chipp ed Edges & Corne rs | / Nozzle Face Missing Corner | Not allowed | Working face ≤5, non- working face ≤10, no more than 2 places | Working face ≤10, non- working face ≤20, no more than 2 places | / |
| Missing Edge | Not allowed | Depth ≤5, length ≤5% of the edge length, no more than 2 places | Depth ≤5, length ≤10% of the edge length, no more than 2 places | / | |
| Gene ral Item s | Drilling | Hole diameter tolerance: ±1; Hole position deviation: ≤1.5 | |||
| Assembly | Contact surface gap: ≤1; Dimensional deviation when length ≤5000: ±2; Dimensional deviation when length >5000: ≤0.5% of length | ||||
| Surface Attachments & | Not allowed | ||||
| Others | |||||
| Remarks: 1. Complies with AZS finished product acceptance standards. | |||||
| 2.If a graded finished product is processed into a scrapped product, it will be handled as an accident, in addition to not calculating the area cost. | |||||
| 3.Regarding assembly dimensional deviations, if there are other requirements for assembly (customer-specific), processing shall be carried out according to those requirements. | |||||